Desert Creek House

Excavation, retaining wall and slab

802 Desert Creek Road,
Numbugga via Bega NSW 2550
Phone: 6492 8498
Email:
desertcreek(at)skymesh.com.au                        Back to Home Page   Return to "Building"



If you want to see:
- the first chapter of the photos (excavation, retaining wall and slab)  Click here
- the second chapter: photos of the wooden structure and roof   Click here
- the third chapter: photos of the rammed earth walls  Click here
- the fourth chapter: exterior cladding, windows, first floor and inner walls  Click here
- the slide show: cladding of the south wall,  Click here   Play it twice! it works well only the second time (because of loading time)



First picture Cutting a tree which menaced falling on the future new house
Next

Taking away the topsoil
Next

Excavation
Next

Storing the soil in order to use it later for the rammed earth walls
Next

Footings with reinforcing rods
Next

Detail of reinforcing rods
Next

Concrete pump truck
Next

Concrete truck
Next

Pumping the concrete into the footings
Next

Vibrating the concrete in the toilet pit
Next

Finishing the surface
Next

Fresh concreted footings
Next

Fresh concreted footings
Next

Retaining wall - front part
Next

Retaining wall - side part with toilet pit
Next

Water inlet, grey water pipe and ventilation pipe
Next

Rain water pipe and grey water pipes
Next

Back side of the retaining wall with drainage, water outlet and ventilation pipes
Next


Watch a short video (40 sec - 3'918 kb) about backfilling behind the walls
Be patient! You have probably to allow your virus protection to access this file by clicking somewhere in the protection bar (Click here for options - Allow blocked content), at the top of the window

Next

The new basement seen from the north side
Next

Digging for the footings for the posts
Next

Small hand concreting
Next

Small hand concreting
Next

Main beam of the basement
Next

Main beam of the basement
Next

Scaffolding
Next

The 2 main long beams of the basement
Next

Detail of the joiners
Next

Beams and joists - front part
Next

Beams and joists - front part
Next

Beams and joists - side part
Next

Basement - front part
Next

Basement - side part
Next

Detail post shoe
Next

Detail
Next

Washing the second hand corrugated iron
Next

Painting the second hand corrugated iron
Next

Fixing connectors
Next

Connectors
Next

Connectors ready to be fixed
Next

Basement with ceiling - front part
Next

Basement with ceiling - side part
Next

The side part seen from the top
Next

The side part seen from the top
Next

Like soldiers
Next

General view
Next

General view - front
Next

General view - side
Next

Upper footings with reinforcing trench meshes
Next

Reserves in the footings for post shoes
Next

The same for one post
Next

Post shoe after concreting
Next

Grey water pipes
Next

Footings with post shoes after concreting
Next

Pipes for the shower (in front) and for the heating wall (behind)
Next

Pipes and electricity below slab
Next

Drainage pipes below slab
Next

Drainage pipes continued
Next

Preparing the reinforcing mesh for the slab
Next

Props under slab
Next

Ready to be poured
Next

Ready to be poured continued
Next

Ready to be poured continued
Next

The big day: concreting of the slab
Next

Concreting of the slab
Next

The concrete pump
Next

Smooth!
Next

Helicopter
Next

Final product
Next

Final product continued
Next

Mirror

Have a look at the:
First chapter of the photos (excavation, retaining wall and slab)  
Click here
Second chapter of the photos (wooden structure and roof)  Click here
Third chapter of the photos (rammed earth walls)  Click here
Fourth chapter of the photos (cladding, windows, first floor and inner walls)  Click here
Slide show: cladding of the south wall  Click here



END - Return to top of the page